New HomesOur potential homeowners generally fall into two separate categories: those with their lot and completed plans and those with their lot but without any plans. Occasionally, we find clients who have no lot, or who have a preliminary plan or idea, but those are rare. For those with completed plans, the design work has already taken place. For those without plans, the design process is the place to begin. After the design process, the steps to completion are the same.
Design Process
If You Already Have Your Plans: Steps 2-6 are skipped. Starts with step 7. Construction Approval Process
Construction begins generally the fourth business day after closing so the title company has time to record the documents and the lending institution makes their clear lot inspection. Selection items are generally made in three groups. Before the home begins, as part of the approval process, the exterior selections such as type and color of brick, stone, stucco, or siding material, paint color and roof color. Shortly after the home’s construction begins, the appliances and cabinets are chosen. The last group is the most entertaining and time consuming part, the actual colors that will go into the home. The ceramic tile, granite, wall paints, wood floors, carpet and all the other items that make it your custom home. The earlier these can be selected the better, but take your time and make sure the items you choose are right for you. |
||
| Wiesner Homes, LLC 3006 Huntington Ct Katy, TX 77493 281-391-3894 |
![]() ![]() © 2005 - 2010 Wiesner Homes Home Remodeling and Custom New Home Builder Katy, Fulshear, Richmond, Rosenberg, Sealy, Bellville, Brookshire and Waller, TX |
||